EXCEL LONDON
Electrical Installation
Project value
Duration
Client
DPH delivered an electrical infrastructure package as part of ExCeL London Phase 3 at Royal Victoria Dock, supporting the expansion of the existing venue by approximately 40,000m², including 11,700m² of new exhibition floor space at ground level and 9,100m² of conferencing accommodation at upper level. Working within a major live-event environment, DPH’s works formed a key part of the enabling electrical infrastructure required to support the extended facility and its future operational demands.
The scope included the installation of dedicated containment systems for power supplies, fire alarm and communications cabling. DPH also delivered power supplies to specialist systems including trace heating and Tanktronic, and earthing & bonding installation, ensuring reliable distribution to critical services across the new build areas. The works were completed testing & commissioning, supporting compliance, safety and long-term maintainability of the electrical installation within this high-profile commercial expansion.
Send a Message
Request a Call Back
Related Projects